Hydrapulper is mainly used for disintegrating all kinds of pulp board, broke paper and all kinds of waste paper.

Hydrapulper is designed on the basis of the existing traditional pulper with reference to foreign advanced technology.
Its main features are:
The off-center position of the Vox rotor makes the contact between the stock and the rotor faster and more frequent. The traditional Hydrapulper produces an unimpeded swirl, with the stock moving in a helical path from the feed to the central rotor.
The Hydrapulper changes this flow, allowing the stock to come into contact with the rotor more quickly, which reduces the time from stock addition to disintegration and increases throughput without increasing power and volume.
Hydrapulper is generally equipped with a rope winch and a slag well. The rope winch can remove long entangled impurities, such as plastic bags, rope ends, iron wires, etc. The recommended rope winch model is JSJ1.
There is a rectangular interface at the bottom of the tank, which is connected to the sediment well and then removes the plastic foam through the impurity rougher.
and other light debris to achieve continuous production, and the heavy debris deposited at the bottom of the sediment well is regularly discharged. The interface can also be equipped with a heavy slag collection tank for intermittent production.
Hydrapulper consists of main components such as tank body, rotor device, outrigger, motor, motor slide rail, and protective cover.
1.The tank body is welded by steel plates. There is channel steel outside the upper mouth to reinforce the tank body. There is a guide plate at the bottom of the inner cone to promote the circulation of the slurry backflow.
There is a rectangular port at the bottom of the tank body for the discharge of impurities, which is opened by the user on site according to the process needs.
2.Rotor device: The rotor and the pulping disc come out of the bottom plane of the pulper tank, and a low-pressure flow area is formed around the rotor to collect heavy impurities. Well, or heavy slag collection tank.
In this way, the contact between the rotor and impurities can be reduced, the service life of the rotor can be prolonged, and the twisted rope can be prevented from being wound on the rotor to protect the twisted rope and the rotor from being damaged.
The rotor adopts energy-saving Vox rotor, and the rotor body is made of cast steel; the blade is made of tool steel and is fastened to the rotor body blade with bolts after heat treatment, and can be replaced after wear;
The sieve plate is made of wear-resistant stainless steel, on which There is a bottom knife, and the gap between the bottom surface of the rotor blade and the bottom knife of the sieve plate is initially set to 2mm, and the gap can be adjusted with adjusting bolts as needed.
3. Outriggers: The outriggers are welded from steel plates and are used to support the tank body and the rotor device.
Before the installation work begins, the pulper foundation must be poured according to the design general arrangement and foundation drawings. When planning the location of the pulper, consider the following:
1. The free space should be large enough to allow the rotor assembly to be moved or removed by a crane, hoisting beam or hoist.
2. The pulper pump should be as close to and below the pulper as possible, and the pulp outlet pipe should be as short and simple as possible.
3. The belt conveyor should be placed on the straight edge of the pulper tank, so that the paper material falls on the side of the rotor and rotates counterclockwise with the pulp.
4. According to the requirements of the foundation drawing, correctly determine the center line, correct the corresponding position and size, and pour the equipment foundation with reinforced concrete.
5. Open the box for cleaning and acceptance, and check whether the parts are complete.
6. After the foundation has passed the fixed maintenance period (usually 15 days) and is corrected correctly, the equipment can be installed.
7. First lift the outriggers to the foundation, and install the anchor bolts into the foundation plate one by one.
8. Lift the tank body to the corresponding installation position of the outriggers, fasten the bottom plate of the tank body and the outriggers together with bolts, and open a rectangular port and a slag discharge port on site according to the process requirements.
9. Lift the rotor device as a whole to the bottom of the tank body inside the tank body, adjust the pulp outlet to the correct position, and remove the lifting ring.
10. Use the leveling screws on the legs to adjust the vertical centerline of the tank body to vertical, and adjust the level of the large pulley.
11. Pour the equipment foundation with concrete, weld the horizontal connection support rod on site, install the tensioning device and adjust it moderately.